HOME / PROJECTS
Case Study · Assembly Space · Houston

TRUE ELEVATION CHURCH — PROJECT 24101507.

A full commercial package for a working sanctuary: rooftop units on new curbs, exposed spiral duct with diffusers set pre-paint, City of Houston permits, and inspections passed on the first pass — all sequenced between Sundays.

GET A QUOTE →CALL (346) 658-3139CITY OF HOUSTON · FIRST-PASS INSPECTIONS
The brief

A hard room on a hard schedule.

Assembly spaces are the toughest rooms in commercial HVAC: enormous volume, near-zero occupancy all week, then hundreds of people for two hours — during which the system must be effectively silent. Add the constraint that the room is in use every single Sunday, and the schedule becomes part of the engineering.

01 · EQUIPMENT

Rooftop packages, staged

Package units set on new curbs by crane, sized and staged for occupancy swings instead of one oversized unit short-cycling the room.

02 · AIR DISTRIBUTION

Exposed spiral, set pre-paint

Spiral duct hung straight and level with diffusers installed before the painters — so the finished ceiling reads as architecture, not retrofit.

03 · PAPERWORK

Permits & first-pass inspections

City of Houston mechanical permits pulled and posted, rough-in and final inspections passed first pass, startup readings documented at handover.

Your building next

Assembly space? Same playbook.

Churches, theaters, gyms and event spaces run on the same physics and the same scheduling discipline. See the assembly playbook →

📞 CALL NOW — (346) 658-3139